H76 returns back towards Allentown with a GP38-2 and an SD50 for power.
H76 rolls into Pennsylvania via the ex-Lehigh & Hudson River bridge over the Delaware River at Easton with one of the very few remaining CR units trailing. The structures in the foreground are rem... (more)
Salisbury Switcher working the box plant at Five Row with a pair of GP38-2's!
294 comes through Hiram with a rebuilt GP38-2 leading. 361, who had been holding the main with power problems starts moving shortly after the locomotives pass by
P92 takes a break from the normal duties on the Yadkin branch and makes a run to Spencer yard. This location is on the Piedmont Division main (former SOU), 45 miles NE of Charlotte.